Built for Engineering Professionals

The Complete Project Management Platform Built for Engineering Firms

Streamline projects, track time, manage teams, and generate invoices - all with specialized engineering tools and AI assistance

Up and running the next day
Project Dashboard
Pulse Point Project Dashboard showing active projects, team utilization, and real-time metrics
∮
Gas Sizing Calculator
IFGC Compliant • AI-Enhanced
Pressure Drop
0.3" WC
Pipe Size
2" IPS

Stop Wrestling with Disconnected Tools

Engineering firms waste countless hours switching between tools, manually calculating loads, and chasing project updates. There's a better way.

The Problem

Current workflow challenges

Fragmented tools across different project phases
Manual calculations prone to errors and delays
Poor project visibility and team coordination
Time-consuming billing and invoice generation
Lack of engineering-specific templates and workflows
35%
of project time wasted on administrative tasks

The Solution

Pulse Point integration

One integrated platform for all engineering workflows
AI-powered calculations with IFGC compliance
Real-time project dashboards and team insights
Automated time tracking and invoice generation
Industry-specific templates for MEP, structural, and civil projects
75%
reduction in project setup time

Everything You Need in One Platform

Purpose-built features that understand how engineering teams work, with the flexibility to adapt to your firm's unique processes.

Smart Project Management

Advanced project templates and real-time monitoring built for engineering workflows

  • Project templates for all engineering phases
  • Task dependencies and team capacity planning
  • Real-time project health monitoring
  • Budget and schedule tracking

Engineering-Specific Tools

Specialized calculators and technical tools that speak your language

  • Gas Sizing Calculator with IFGC compliance
  • AI-enhanced pressure drop analysis
  • Technical report generation
  • Professional documentation tools

Integrated Time & Billing

Seamless time tracking to automated invoicing in one unified system

  • Comprehensive timesheet management
  • Automated invoice generation
  • QuickBooks integration
  • Expense tracking and approvals

AI-Powered Insights

Meet Paul, your intelligent project assistant that learns from your workflows

  • Paul: Your intelligent project assistant
  • Automated content generation
  • Utilization forecasting
  • Performance analytics

Team Management

Coordinate multi-disciplinary teams with precision and transparency

  • Multi-disciplinary team coordination
  • Capacity planning and workload balancing
  • Role-based permissions
  • Approval workflows

Advanced Analytics

Executive dashboards and insights that drive better business decisions

  • Executive dashboards
  • Portfolio health scoring
  • Financial performance tracking
  • Custom reporting
Industry Expertise

Built for Engineering, Not Adapted From It

We understand that engineering projects have unique requirements. Our platform is designed from the ground up with engineering workflows in mind. See how teams keep drawings and specs in one place in our guide to secure cloud document management for engineering teams.

Project Phase Templates

Pre-configured workflows for Schematic Design, Design Development, Construction Documents, and Construction Administration phases

MEP/Structural/Civil Ready

Industry-specific tools and templates for mechanical, electrical, plumbing, structural, and civil engineering disciplines

Professional Compliance

Built-in compliance tracking for IFGC, IBC, ASHRAE, and other industry standards with automated documentation

Technical Calculations

Advanced calculation engines for load analysis, pressure drop, pipe sizing, and other engineering calculations

Industry Standards Supported:

IFGC Compliance
IBC Standards
ASHRAE Guidelines
AISC Standards
Project Phase Tracking

Commercial Office Building - MEP Design

SD
Schematic Design
100%
DD
Design Development
75%
CD
Construction Documents
45%
CA
Construction Administration
0%
Next Milestone
HVAC Load Calculations Due
3 days remaining

Measurable Results That Drive Growth

Engineering firms using Pulse Point see significant improvements in productivity, efficiency, and profitability within the first 30 days.

75%
Reduce project setup time

Get projects started faster with pre-configured templates and automated workflows

35%
Improve team utilization

Better workload balancing and capacity planning across all team members

5x
Faster invoice generation

Automated time tracking and billing integration eliminates manual invoice creation

100%
Eliminate calculation errors

AI-powered engineering calculations ensure accuracy and compliance

ROI Calculator
Your potential savings
Team size:8 engineers
Time saved per week:12 hours
Average hourly rate:$125
Monthly savings:$6,000
Annual savings:$72,000

Choose the Right Plan for Your Firm

Select the plan that best fits your team size and needs. Contact us for a personalized consultation.

MOST POPULAR

Professional

For growing engineering firms

$499/month
  • Unlimited projects
  • Advanced engineering templates
  • Gas sizing calculator
  • AI-powered insights (Paul)
  • Advanced analytics
  • Email support
  • Custom workflows
  • Team capacity planning
  • Professional reporting

Enterprise

For large organizations

from $1,499/month
  • Everything in Professional
  • Unlimited users
  • QuickBooks integration
  • Custom integrations
  • Dedicated account manager
  • Advanced security features
  • Custom training
  • API access
  • Custom reporting

Feature Comparison

FeaturesProfessionalEnterprise
Active ProjectsUnlimitedUnlimited
Gas Sizing Calculator✅✅
AI Assistant (Paul)✅✅
QuickBooks Integration❌✅
Custom Integrations❌✅
Support LevelEmailDedicated

Ready to Get Started?

Contact us today to discuss which plan is right for your engineering firm and get a personalized demonstration.

Frequently Asked Questions

Get answers to common questions about Pulse Point Project Tracker

Security is our top priority. We use enterprise-grade encryption (AES-256), secure data centers with SOC 2 Type II certification, and maintain strict compliance with industry standards. All data is backed up regularly, and we offer role-based access controls to ensure only authorized team members can access sensitive information.

Still have questions?

Our engineering specialists are here to help. Schedule a personalized demo to see how Pulse Point can transform your project management workflow.

Ready to Transform Your Engineering Projects?

Let's discuss how Pulse Point can help you streamline project management, improve team collaboration, and boost productivity at your engineering firm.

Location

Medina, OH

Schedule a Demo

GLXYsoftware

Custom AI software solutions designed to transform your business. We specialize in machine learning, natural language processing, and computer vision technologies.

Contact

© 2026 GLXY Software. All rights reserved.